Skip to main content
Loading…
This section is included in your selections.

Development on sites with a wetland or wetland critical area buffer shall incorporate the following performance standards in design of the development, as applicable:

A. Lights shall be directed away from the wetland.

B. Activity that generates noise such as parking lots, generators, and residential uses shall be located away from the wetland, or any noise shall be minimized through use of design and insulation techniques.

C. Toxic runoff from new impervious area shall be routed away from the wetlands.

D. Treated water may be allowed to enter the wetland critical area buffer.

E. The outer edge of the wetland critical area buffer shall be planted with dense vegetation to limit pet or human use.

F. Use of pesticides, insecticides and fertilizers within 150 feet of the edge of the stream buffer shall be in accordance with the City of Bellevue’s “Environmental Best Management Practices,” now or as hereafter amended.

G. All applicable standards of Chapter 24.06 BCC, Storm and Surface Water Utility Code, are met. (Ord. 6417, 5-21-18, § 34; Ord. 5680, 6-26-06, § 3)