Skip to main content
Loading…
This section is included in your selections.

The Director may waive specific submittal requirements determined to be unnecessary for review of an application. In addition to the provisions of LUC 20.25H.020, any application for development in frequently flooded areas may be required to include, but not be limited to, the following:

A. Elevation prepared by a surveyor licensed in the State of Washington in relation to mean sea level of the lowest floor, including basement, of all structures;

B. Elevation prepared by a surveyor licensed in the State of Washington in relation to mean sea level to which any structure has been or will be floodproofed;

C. Certification by a registered professional engineer or architect that the floodproofing methods for any nonresidential structure meet the floodproofing criteria in LUC 20.25H.180.B and C;

D. Description of the extent to which a watercourse will be altered or relocated as a result of proposed development;

E. Where development is proposed in a floodway, an engineering analysis indicating no rise of the BFE; and

F. Any other such information that may be reasonably required by the Director to review the application. (Ord. 6521, 7-27-20, § 6)