Res. 9772 Authorizing the execution of a three-year Microsoft Enterprise Agreement for required Microsoft licenses and subscriptions, with anticipated annual license adjustments that are necessary for the continued and future use of Microsoft products and services by the City, in an amount not to exceed $1,939,879, plus all applicable taxes. 6/15/2020 Special
Res. 9771 Determining that a portion of an existing water line easement located at 12863 Northup Way is surplus to the City’s needs and is no longer required for providing continued public utility service; and setting a time and place for a public hearing to consider the partial release of this easement. 6/15/2020 Special
Res. 9770 Authorizing execution of a Professional Services Agreement with KPFF Consulting Engineers, Inc. in the amount of $372,637.84, plus all applicable taxes, to provide engineering services, and prepare construction contract documents, for the 130th Avenue NE Station Area Park and Ride Interim Project (CIP Plan No. CD-48). 6/15/2020 Special
Res. 9769 Approving the Safe Systems approach and strategies to move Bellevue towards Vision Zero and directing the Transportation Commission to review the Comprehensive Plan to determine if any updates, revisions, or additional policies are warranted to support the Safe Systems approach. 6/15/2020 Special
Res. 9768 Determining that a portion of an existing water easement located at 13804 NE 20th Street is surplus to the City’s needs and is no longer required for providing continued public utility service; and setting a time and place for a public hearing to consider the partial release of this easement. 6/15/2020 Special
Res. 9767 Authorizing the execution of documents necessary to convey limited access rights adjacent to I-90 within the Eastgate area of Bellevue to the Washington State Department of Transportation. 6/15/2020 Special
Res. 9766 Ratifying and confirming Fourth Civil Emergency Order Imposing Curfew of June 3, 2020 and Termination of Fourth Civil Emergency Order imposing Curfew of June 4, 2020. 6/15/2020 Special
Res. 9765 Ratifying and confirming Second Civil Emergency Order Establishing Prohibited Items of June 1, 2020. 6/4/2020 Special
Res. 9764 Ratifying and confirming Civil Emergency Order Establishing Prohibited Items of May 31, 2020. 6/4/2020 Special
Res. 9763 Ratifying and confirming Third Civil Emergency Order Imposing Curfew of June 2, 2020. 6/4/2020 Special
Res. 9762 Ratifying and confirming Second Civil Emergency Order Imposing Curfew of June 1, 2020. 6/4/2020 Special
Res. 9761 Ratifying and confirming Civil Emergency Order Imposing Curfew of May 31, 2020. 6/4/2020 Special
Res. 9760 Authorizing execution of an amendment to increase the construction contract amount with Interwest Construction, Inc. (Bid No. 19042) by $700,000, plus all applicable taxes, for a total contract amount of $12,241,006.90, plus all applicable taxes, for the NE Spring Boulevard Multimodal Corridor Zone 2 Project (CIP Plan No. PW-R-173). 6/1/2020 Special
Res. 9759 Authorizing execution of a purchase order with the King County Directors’ Association (KCDA) Purchasing Network in the amount of $759,658, plus all applicable taxes to replace the synthetic turf field and resurface the rubberized track at Wilburton Hill Park. 6/1/2020 Special
Res. 9758 Authorizing execution of a tariff Schedule 74 Underground Conversion Project Construction Agreement with Puget Sound Energy (PSE) for the 124th Avenue NE – NE 12th Street and NE Spring Boulevard Project (PW-R-169). 6/1/2020 Special
Res. 9757 Authorizing the City Manager to enter into an agreement for the Community Homes for Shared Living Home #1 in the amount of $46,010, as recommended by the ARCH (A Regional Coalition for Housing) Executive Board. 5/18/2020 Special
Res. 9756 Authorizing execution of a professional services contract with Hayre McElroy & Associates, LLC, for required independent third -party construction monitoring and inspection of the Bellevue Downtown Park - NE Gateway project, in an amount not to exceed $130,797 plus all applicable taxes. 5/18/2020 Special
Res. 9755 Authorizing execution of an amendment to the Agreement for Professional Services with Pacifica Law Group LLP, outside counsel for the City in the lawsuit of Greensun v. City of Bellevue (KCSC Case No. 14-2-29863-3 SEA), in an amount not to exceed $250,000, plus all applicable taxes. 5/18/2020 Special
Res. 9754 Authorizing execution of a five-year Wireless Communications Facilities Site Lease Agreement with an automatic five-year extension with New Cingular Wireless PCS at the Clyde Hill Water Reservoir Site located at 9600 NE 22nd St. 5/18/2020 Special
Res. 9753 Authorizing execution of Supplement 1 of a Professional Engineering Services Agreement with HOR Engineering, Inc. (Contract No. 1950175) in the amount of $128,071, plus all applicable taxes, for a total contract amount of $286,978, plus all applicable taxes, to provide engineering support services during construction of the 124th Avenue NE Improvement Project, Seattle City Light (SCL) Transmission Tower Replacement (CIP Plan No. PW-R-191). 5/18/2020 Special
Res. 9752 Authorizing execution of a five-year lease agreement with Multicultural Radio Broadcasting, Inc. for lease of property in the Mercer Slough Nature Park for the continued operation of an existing AM radio transmission facility located at 2205 118th Ave SE. 5/18/2020 Special
Res. 9751 Authorizing execution of a purchase agreement with Freightliner Northwest for the purchase of two replacement Freightliner Utilimaster walk-in step vans for the Utilities Department, in an amount not to exceed $219,776, plus all applicable taxes. 5/4/2020 Special
Res. 9750 Authorizing execution of Amendment No. 3 to the professional services agreement with Stantec Consulting Services Inc., in the not to exceed amount of $77,384.04, plus all applicable taxes, bringing the total contract value in the not to exceed amount of $589,478.67, plus all applicable taxes, for Midlakes Pump Station Capacity Improvements (CIP Plan S-61). 4/20/2020 Special
Res. 9749 Authorizing execution of Supplement No. 2 of a Professional Engineering Services Agreement with HDR Engineering, Inc. in the amount of $64,499, plus all applicable taxes, for a total contract amount of $1,539,467 plus all applicable taxes, to provide engineering support services during construction of the 124th Avenue NE – NE Spring Boulevard to Ichigo Way Project (CIP Plan No. PW-R-166). 4/20/2020 Special
Res. 9748 Authorizing execution of a permanent sign easement on City-owned property located at 11100 NE 6th Street, known as the Meydenbauer Center, to the Washington State Department of Transportation as part of the I-405 Renton to Bellevue Widening and Express Toll Lanes project. 4/20/2020 Special