A. Purpose. The purpose of the gateways is to mark the transition into the F1 Land Use District and to reinforce the Factoria identity.

B. Number and Location. Three gateways are required along Factoria Boulevard at SE 38th Street, SE 40th Street and SE 41st Place.

C. Approval. Gateway conceptual design and installation phasing will be approved through the Master Development Plan process. Gateway design details will be approved through the Design Review process. (Ord. 5726, 3-19-07, § 3)