Skip to main content
Loading…
This section is included in your selections.

A. Prior to issuance of a Building Permit, if specific uses or classes of uses can be identified, or any time thereafter when specific uses or classes of uses are identified, the applicant must provide documentation that Metro, the Department of Ecology, the Puget Sound Air Pollution Control Authority and the Environmental Protection Agency have been contacted, and that all applicable standards will be met prior to the occupancy of the structure. To the maximum extent possible, this contact must occur early in the development process so that necessary measures may be implemented during the construction phase.

B. No outside storage of toxic or hazardous waste or materials as defined by Metro, the Department of Ecology, or the Environmental Protection Agency is permitted. Interior storage must comply with all applicable federal and state regulations.

C. No discharge or emission of toxic or hazardous waste or material into the air, storm drainage system or other water is permitted without prior approval of each applicable implementing agency.

D. The provisions of the Noise Control Code (Chapter 9.18 BCC) apply to the Evergreen Highlands Design District except as they conflict with the provisions of this section. (Ord. 5232, 6-26-00, § 7; Ord. 3219, 1-17-83, § 7)